A whole school put into Legionella Ready, film by film.

Eleven short films, 46 minutes in all, show Oakfield School being set up in the app: its floors and rooms, its plant, and every outlet connected. By the end you can do the same for your own building.

Oakfield School is invented. We made it up so that nothing in the films would have to be blurred or left out. Every room, pipe and tap is there to be seen.

11 films · 46 minutes · Captions and a written transcript on every film · Free to watch

Film 7 of 11 · Connecting room outlets

Adapt a room with an extra shower

Connect the changing room next door, including its additional shower.

1:37
Your place is saved on this device.

In this film

Choose a chapter to watch from that point.

  1. The second changing room
  2. Save and reload these rooms
Where this film is on the plan
Open drawing ↗

Rooms in this film: G08.

Oakfield School ground floor plan, rooms in this film highlighted
Proposed layout · Room names match the films.Download all five drawings (PDF) ↗
Before you begin and what you’ll learn

The first changing room is connected. The second has a different number of outlets, so it needs a selected-outlet approach.

  • Use a completed shower as the starting example.
  • Include all six outlets in the second room.
  • Save and reload the completed ground-floor work.
Read the commentary Timed transcript +

We’ve just completed the first changing room. Now we’ll connect the second one, still on the ground floor. We start with a completed shower in the first room, then apply its recorded supplies to the outlets next door, including the extra shower.

The second changing room has four showers and two basins. It is not an exact room match, but all six outlet assemblies share the supplies used in the first changing room. I select a completed shower as the source, then choose the six outlets in the second room. The extra shower is included in the same operation.

Six outlets means twelve proposed connections. Shower four is listed alongside the other showers and both basins. We can apply the supplies without needing the two rooms to contain identical equipment. Then we inspect the result and save our progress.

The cleaner’s sink and every ground-floor room are connected. I’m saving, then reloading the saved version. This gives us a clear checkpoint before we move upstairs.

That completes the ground-floor rooms. In Film Six, we move upstairs to the first-floor classrooms and science laboratories. We’ll reuse the hot and cold arrangement for the classroom basins, then record a cold-only arrangement for the laboratory sinks.

The school

We drew the school so the films can be followed.

Oakfield has a front, five floors and a code on every room. Each room in the films is on a plan, so you can see where you are before you press play.

Architectural front elevation of Oakfield School: a central entrance block with two lower wings
Oakfield School · front elevation · an invented building
Open drawing ↗

Main entrance, teaching block, dining wing, sports hall and outside taps.

Oakfield School campus plan
Proposed layout · Room names match the films.Download all five drawings (PDF) ↗

The same for your building

Your rooms, your equipment, your procedures, on film.

The Oakfield films were made by recording the app as the school was built. The same can be done for a real building once it is in Legionella Ready, so your staff learn on the rooms they actually walk through.

What you give us

  • Your floor plans, or a walk round the building
  • The name of every room with water in it
  • The procedures your staff are expected to follow

What you get

  • Your building set up in Legionella Ready, floor by floor
  • Films of it being built, chapter by chapter, that your staff can return to
  • A building record that already exists on the day you start
Ask about films for your site